Dongfang Nengyuan drawing of overall plan
2025/10/27
Project Introduction:
The first floor consists of 2 sets of 200L filling line and 1 set of IBC filling line
The second floor consists of 1 set of 1L filling line and 3 sets of 4L filling line
The third floor consists of 2 sets of 20L filling line



Related products
Related news
Related cases














